| Drill rig arrives |
| We pray that the work will go smoothly |
| Andy at work |
After a few days or maybe a week of repairing the drill it finally worked and you can see on the picture below, a temporary pump is finished. We found water at 70 ft and then stopped at 100 ft allowing for the dry season water table drop. The water pumping and filtration system still needs to be installed.
The outcome of this project will be clean drinking water for the orphanage and the community. The idea is to start selling bags with purified water in it to have another source of income.
Praise the Lord! It might have taken longer than expected but hopefully it has been worth the wait.
ReplyDeleteMike and Brenda Harwood